The new dam will be the first of the works to be undertaken in 2003-2004. Designed to provide effective flushing of the Couesnon, year after year, the dam will release water on the ebb tide to clear sand from around the Mont.
The project submitted by groupement won the selection committee's approval for the way it intermeshes engineering, architectural and environmental considerations. The result of a thorough study of the site, it offers a tailored answer to the problem.
Elegant and unobtrusive, the new dam relies on proven, reliable techniques. Filling and emptying will be done by eight sector-sluices, each operated by two cylinders. .
It will blend in with the river banks and dykes. With the opening of the sluices and the changing water level, it will look different all the time, and almost disappear from view when the sluices are wide open.