From the 3rd of January will take place the first environmental work of the project. The joint council will create, in the Moidrey Cove area, around ten bassins so that the pélodytes ponctués, a protected frog, would have a proper reproduction place. At the same time the first channels will be dredge in the same zone to experiment what will be the tidal reservoir.